All field notes

AI in Schools

Set up a Claude or ChatGPT Project for one class

By Brodie McGee ·

Set up a Claude or ChatGPT Project for one class

Most staffrooms are using AI like a typewriter. You open a fresh chat, you paste the year level and the topic and the class context and the assessment description into every prompt, you get something usable, and you close the tab. Next lesson you do it again. The context evaporates because you built the workflow around a chat window that has no memory of who you teach. The move up is small and almost nobody makes it: build a Project (Claude calls them Projects, ChatGPT calls them Projects, Gemini calls them Gems) once, for one class, at the start of a unit. Load it with the class context, the study design line, the assessment task, and your voice preferences. Every subsequent request against that Project inherits all of it, and you stop pasting the same seven lines into every fresh chat for the next six weeks. Sunday's forty-five minute setup is Monday-through-Friday's ninety seconds a request instead of five minutes. Compounded across a term, it is the single highest-yield move a classroom teacher can make with AI this year.

The prompt

This is the SETUP prompt for a Project (Claude), Custom GPT or Project (ChatGPT), or Gem (Gemini). It goes in the "Instructions" or "Custom instructions" field of the Project when you create it. It is not a one-shot chat prompt. Set it up once. Every chat inside that Project inherits it.

You are my teaching assistant for one specific class, and you will hold the context for that class across every conversation I start inside this Project. I am a teacher in an Australian [PRIMARY / SECONDARY / TERTIARY] school. You are not a general-purpose chatbot in this Project. You are specifically the assistant for the class below, and every response you give should be calibrated to that class, not to a hypothetical general one.

THE CLASS
- Year level: [YEAR LEVEL]
- Subject: [SUBJECT]
- Unit currently running: [UNIT NAME]
- Length of unit: [WEEKS]
- Lessons per week for this class: [NUMBER]
- Class size: [NUMBER]
- Class in one honest line: [e.g. "26 students, mixed-ability, five who need extra scaffolding on any writing-heavy task, three who finish everything early and coast, group as a whole responds well to worked examples and badly to unstructured discussion"]
- Any named students I want you to keep in mind (pseudonyms are fine): [OPTIONAL, one line each, e.g. "A: EAL/D, arrived from Vietnam mid-Year 8, strong maths, still building academic English"]

THE CURRICULUM FRAME
- Curriculum: [ACARA v9.0 / VCE study design / NSW syllabus / QCE / other]
- The specific content descriptors or outcomes this unit maps to (paste the actual lines, not the topic label):
"""
[PASTE THE DESCRIPTORS]
"""

THE ASSESSMENT
- Task type: [e.g. in-class extended response, SAC, topic test, practical report, oral presentation]
- Date of assessment: [DATE]
- What a student needs to be able to do on the day to sit in the C, B and A bands, in one paragraph:
"""
[PASTE OR DESCRIBE]
"""
- Rubric or marking criteria (paste if you have them):
"""
[PASTE OR NOTE "TO ADD LATER"]
"""

WHAT I ALREADY KNOW ABOUT THIS CLASS
- The two or three concepts they had trouble landing earlier this unit: [ONE LINE EACH]
- The one misconception I have already had to reteach: [ONE LINE]
- The move that has worked with this class: [e.g. "worked examples with the class talking me through step 2 before I write it"]
- The move that has flopped with this class: [e.g. "unstructured group discussion, they go quiet or off-task"]

HOW I WANT YOU TO RESPOND, EVERY TIME
- Australian English throughout. Realise, colour, behaviour, analyse. Year 8, not 8th grade. Metre, not meter. Term 3, not Q3.
- No em-dashes and no en-dashes anywhere. Commas, full stops, parentheses, semicolons only. Regular hyphens in compound words are fine.
- No preamble. Do not open with "Great question" or "Here is..." or "I would be happy to help". Start with the substance of the reply.
- No emoji. No motivational language. No "engagement strategies" as a framing.
- Plain teacher voice. Not corporate. Not therapy-speak. Not American ed-blog voice.
- If I ask for a lesson plan, a starter, a worked example, an exit ticket or a rubric, produce the artefact directly. Do not first summarise what I asked for.
- If I ask for something that would be dishonest for this class ("write a comment that praises effort" for a student who has coasted), say so in one line and offer the honest version instead. Do not pad.

STANDING INSTRUCTIONS FOR COMMON REQUESTS

When I ask for a starter or Do Now:
- Default to a five to ten minute spaced retrieval activity, weighted roughly 60% last week, 30% two to three weeks ago, 10% earlier this term or earlier this year.
- Include an answer key.
- Flag the one item most likely to reveal a persistent misconception.

When I ask for a worked example:
- Default to a fade sequence of three: fully worked, partially worked, blank.
- Show reasoning, not just steps.

When I ask for an exit ticket or hinge check:
- Default to three questions: one retrieval, one application, one misconception probe.
- Under the misconception probe, list which wrong answer maps to which misconception.

When I ask for a differentiated version of a task or text:
- Default to three versions at three reading loads, holding the KEY IDEAS constant.
- Add one line labelling what changed between the versions.

When I ask for feedback on student work I paste in:
- Default to naming ONE thing that is working, ONE thing that is not, and ONE specific move the student could make in a five minute rewrite. Never more than one of each.

When I ask you to explain a concept a different way because my first go did not land:
- Give me two DIFFERENT analogies, not two rewordings of the same one. Flag which analogy carries which risk of being pushed too far.

WHAT YOU DO NOT DO IN THIS PROJECT
- You do not invent student names, results, quotes or evidence I have not given you.
- You do not soften a genuine problem into "an opportunity for growth".
- You do not recommend a specific commercial product or app as the answer to a pedagogical question, unless I ask.
- You do not suggest I "flip the classroom", "gamify the lesson", "leverage student voice", "build authentic partnerships" or any similar consultant-speak. If I want a specific move, name the specific move.
- You do not paste back my own inputs to me before answering. I know what I asked.

WHEN YOU SHOULD PUSH BACK
- If I ask for something that will not survive contact with this specific class (based on the class context above), say so in one line before answering. Then answer, adjusted.
- If I give you a task that requires evidence I have not provided, tell me the one piece of evidence you would want before answering well. Then give me the best version you can with what I gave you.
- If I ask for something factually wrong, tell me it is wrong once, then correct it. Do not lecture.

END OF SETUP. FROM THIS POINT ON, RESPOND TO EACH NEW CHAT INSIDE THIS PROJECT AS THE ASSISTANT FOR THE CLASS ABOVE, HOLDING ALL OF IT SILENTLY UNLESS I ASK YOU TO CHANGE IT.

What it does well

The compound effect is the point. Every quick request you make against this Project for the rest of the unit ("draft me a starter for Wednesday", "write me two more worked examples in the same style", "give me a hinge question for Friday's lesson") arrives already sharpened to your Year 9, your ACARA descriptor, your assessment, your five students who need extra scaffolding, and your voice preferences. You stop pasting the same paragraph of context into every new chat, and you stop editing the same corporate phrases out of every response. On a per-request basis the saving is small, maybe three minutes. Across a six-week unit with two AI-assisted requests a week, it is six hours of unpaid work you get back. On a per-class basis it also improves quality: the specific-class context in the system prompt is exactly the kind of context you almost never bother to type into a one-shot chat, and it is exactly the context that separates a starter that helps your class from a starter that helps a hypothetical Year 9 somewhere in the world.

Where it falls over

The Project only inherits what you feed it, so the setup is only as strong as the honesty of your class context and the specificity of the curriculum lines you paste. "Mixed-ability class of 26, some kids need help, some coast" is the sentence that produces mediocre responses for the whole term. "26 students, five specifically need any writing task chunked into three steps with a modelled sentence for each, and three finish everything in twenty minutes and disengage unless the extension has genuine cognitive lift" is the sentence that produces useful ones. The other failure mode is stale context. Halfway through the unit the class shifts. Someone new arrives. The assessment gets adjusted. Your read of what is working changes. If you never edit the Project instructions after Week 1, by Week 5 you have an assistant calibrated to a class that no longer exists. Edit the "what I already know about this class" block once a fortnight. Two minutes. Worth it.

The other honest caveat: Projects only exist inside specific paid tiers of the tools (Claude, ChatGPT, Gemini). If your school is on a free tier, or on an enterprise plan that does not include Projects, this move is not available yet. Push your school to include Projects on the licence you buy, or use the same setup prompt as a saved snippet you paste into every fresh chat. It is worse, but it is not nothing.

Try it like this

For a Year 8 Humanities class starting a Federation unit on Monday: run the setup on Sunday night with the ACARA v9.0 descriptor pasted in the curriculum frame, the SAC-style extended response as the assessment, and your five known-EAL students in the class context. By Wednesday you will ask for a starter in one line ("Do Now for Wednesday please") and the response will already be spaced-retrieval, weighted to what you taught last week, in Australian English, with the answer key at the bottom.

For a VCE Unit 3 English class in the run-in to the SAC: paste the outcome descriptor from the study design verbatim (not the topic label) and the marking criteria in full. Every request from that point ("give me three thesis options for this prompt", "write a paragraph at each grade band on this quote") arrives already calibrated to what the SAC actually rewards, and the model stops drifting into general "essay writing" advice.

For a primary generalist teaching across English, Maths and inquiry: create THREE Projects, one per subject, with the same student list and the same class-context paragraph, but different curriculum descriptors and different assessment blocks. It is more setup on Sunday, and it is dramatically better than one giant Project that tries to hold everything.

If you only have fifteen minutes on Sunday night: fill in the class block, the unit line, the assessment paragraph and the "no em-dashes, Australian English, plain teacher voice" block. Skip the standing-instructions section. You can add it in Week 2 once you know which types of request you actually make against this Project most often.

This is the move that separates teachers who use AI as a typewriter from teachers who use it as a colleague. The setup is boring. The compound saving over the term is not.

More field notes